5 thoughts on “Another truck stuck for an hour under the 11 foot 8 bridge

  1. How many more collision will it take to get the problem fixed?
    The railroad would have to go back at least a half mile in both directions to change the grade sufficently at the bridge. It would be easier to lower the road and reroute the side street. I am sure the local government critters do not want to spend money on a really needed project until the bribes are in place.

  2. The sign is posted as a forewarning. Can’t people figure out how tall the truck is that they’re driving?
    . . .

Join the Conversation

Your email address will not be published. Required fields are marked *


*